You may obtain copies of these documents at the Council of Government office in the jurisdiction in which the project is located or at:

North Carolina Department of Administration
State Environmental Review Clearinghouse
325 N. Salisbury St., 11th Floor
Raleigh, North Carolina 27603

Written comments regarding a proposed project must be received by the State Environmental Review Clearinghouse by the Review Close Date indicated on the project. Submit comments to:

North Carolina Department of Administration
State Environmental Review Clearinghouse
1301 Mail Service Center
Raleigh, North Carolina 27699-1301

or State.Clearinghouse@doa.nc.gov

Control NumberApplicantProject DescriptionDate ReceivedReview Close
Date
27-E-0000-0027 Chris Biesecker, Waterford Pointe Ptnrs The project consists of the construction of four single-family residences east of Kendricks Cove in Lexington, Davidson County, North Carolina as part of the Yachtsman’s Point Subdivision. The subdivision will be constructed on an approximately 19.6-acre tract of vacant land and will be subdivided into 4 lots including waterfront access areas consisting of aluminum piers and floating docks. The subdivision will be accessed from an existing paved two lane road. The lot lines adjacent to the shoreline will be a minimum of approximately 200 linear feet wide. Water depths approximately 75-feet from the shoreline were measured by Cube Yadkin, LLC on August 11, 2026. 08/27/2026 09/25/2026
27-E-0000-0028 US Department of the Interior Proposed project requests a right-of-way permit for operating and maintaining an existing 4-inch underground natural gas transmission pipeline, a 16 inch underground natural gas transmission pipeline, maintained ROW and valve site within the boundaries of the refuge. 08/27/2026 09/25/2026
27-E-0000-0029 US Coast Guard Proposed action would place dredged material adjacent to these wetland shoreline areas via pipeline, restoring subtidal habitat, or in deep-water areas. Prior to construction geotechnical sediment investigations would be performed to ensure that the dredged material and existing benthic sediments in proposed placement areas are compatible, and that the proposed action could be beneficial to the surrounding area. 08/27/2026 09/25/2026
27-E-0000-0030 Town of Greenevers Project proposes to provide Rehabilitation/Reconstruction of 2 homes. The homes are scattered throughout the town. All required construction and demolition permits to accomplish these activities are included in the proposed project. 08/27/2026 09/25/2026
27-E-0000-0031 Town of Tabor City Project proposes to provide Rehabilitation/Reconstruction of 2 homes and Rehabilitation of 1 home. The homes are scattered throughout the town. All required construction and demolition permits to accomplish these activities are included in the proposed project. 08/31/2026 09/29/2026
27-E-0000-0032 NCDOT, Division of Aviation Proposed project includes rehabilitation of the existing south apron pavement and associated pavement markings. Also included is the expansion of the south apron to accommodate future hangar development area. The exact pavement rehabilitation method will be determined after the geotechnical investigation is complete, but it is expected that reconstruction of the pavement section may be required. 09/01/2026 09/30/2026
27-E-0000-0040 NC Office of Recovery and Resiliency (“Proposed Project”) located on approximately one acre located along Vance Street near
First Street West, Pembroke, Robeson County, NC 28372. According to the Robeson County Tax Map, the two Town-owned parcels are identified as Parcel ID #350402007 which is 0.2 acres and #350402009 which is 0.6 acres and their adjoining Right-of-Way (ROW) (Subject Property). NCORR is also administering NC Department of Environmental Quality (DEQ), Mitigation Services Division funding awarded for this Proposed Project.
09/17/2026 09/30/2026
27-E-0000-0033 US Army Corps of Engineers Proposed project is intended to generate mitigation credits to provide compensatory mitigation for unavoidable impacts to streams and wetlands associated with DA permit authorizations. Proposed project would affect waters of the United States associated with unnamed tributaries draining to Dunhams Creek. The project is located at Latitude 35.328808 and Longitude -79.381489; on the East side of Hulsey Rd. in Carthage, Moore County, NC. 09/02/2026 10/01/2026
27-E-0000-0034 US Army Corps of Engineers The Town is proposing an inlet and shoreline protection plan referred to as the New River Inlet Master Management Plan (NRIMMP) that includes construction of a terminal groin at New River Inlet as its preferred alternative. Please refer to “SAW-2016-02091” in your comments. 09/04/2026 10/05/2026
27-E-0000-0035 US Army Corps of Engineers, Wilmington D Proposed Site are to: reconnect channels with floodplains and riparian wetlands to allow a natural flooding regime; improve stability of stream channels; restore and enhance native vegetation; and restore and enhance groundwater hydrology to drained or impacted hydric soil areas. The objectives of the proposed Site are to restore or otherwise improve the following functions to the Site’s degraded resources: hydrology, water quality, and habitat. 09/04/2026 10/05/2026
27-E-0000-0023 NCDOT Division of Highways Project proposes replacing Bridge 13 over the Cape Fear River on US 17/US 76/US 421 in New Hanover and Brunswick counties. The existing bridge was constructed in
1969 and has been classified as functionally obsolete by the National Bridge Inventory (NBI). This document identifies and assesses alternatives for NCDOT State Transportation Improvement Program (STIP) Project HB-0039, the Cape Fear Memorial Bridge Replacement Project in New Hanover and Brunswick Counties, North Carolina.
https://xfer.services.ncdot.gov/pdea/EnvironmentalDocs/Documents/STIP_HB-Projects/HB-0039/
https://www.ncdot.gov/projects/cape-fear-bridge-replacement/Documents/cape-fear-environmental-assessment.pdf
08/18/2026 10/07/2026
27-E-0000-0036 NCDOT Division of Aviation Proposed project will include the pavement rehabilitation of the existing aircraft parking apron and the north taxilane at the Lincoln County Regional Airport (IPJ). The existing pavement sections in these areas are anticipated to include bituminous asphalt over a crushed aggregate base. The pavement rehabilitation method will be determined once a geotechnical investigation is complete. The pavement for the proposed rehabilitation is anticipated to be a flexible pavement section consisting of crushed aggregate base course and bituminous concrete surface course. The final pavement section design will be performed after receipt of the pre-design geotechnical investigation. 09/09/2026 10/08/2026
27-E-0000-0037 US Army Corps of Engineers The Chunk Mitigation Site proposes to restore approximately 6,300 linear feet of stream (valley length). Stream restoration efforts are designed to restore a braided, D-type stream system in a low-gradient valley and will be conducted using the Coastal Plain guidelines (USACE et al. 2007). Where it enters the Site, the stream will be diverted from its current ditched location into a historic topographic valley that was identified by QL2 LiDAR (Figure 6, Appendix A) and verified during field investigations. In the lower reaches, where the existing feature enters and follows the historic alluvial valley, spoil piles along both banks will be removed where appropriate, and the existing channel will be abandoned using a series of plugs, fill, and woody habitat structures. Restoration at the Site is expected to entail 1) channel diversion, 2) channel stabilization, and 3) ditch/channel backfill. 09/09/2026 10/08/2026
27-E-0000-0038 Benesch Proposed project consists of an approximately 0.5-mile, multi-use trail through Dallas Park. The trail will extend from the park entrance on NC-275 south to an existing trailhead near Sportsman Drive. It will connect to a previously explored/designed greenway which extends south for about 0.5 miles to Gastonia Technology Parkway. 09/10/2026 10/09/2026
27-E-0000-0039 Town of Nashville Proposed project involves the construction of a 2,500-foot, 16-inch diameter gravity sewer main that will connect the Regency Estates sewer network directly to the Town’s main sewer outfall line, allowing for the abandonment and removal of the existing Regency Lift Station. The new pipeline will include sixteen (16) 5-foot diameter sanitary sewer manholes for access and maintenance. The new sewer main will follow a route along an existing surface water drainage corridor, minimizing environmental disruption and construction costs. A portion of the sewer line, approximately 560-feet, will be installed using directional boring to safely pass beneath US Highway 64, its on/off ramps, and Red Oak Road, ensuring minimal traffic disruptions and compliance with Department of Transportation regulations. 09/17/2026 10/16/2026
27-E-0000-0041 NCDOT, Division of Aviation Proposed project includes removal of the existing AVGAS Fuel System adjacent to the existing Terminal Building and installation of a new 12,000-gallon AVGAS Fuel System along with new pumps/mechanical equipment, and self-service equipment within the existing Fuel Farm containment area at the Airport as shown in the attached exhibit. Replacement of the AVGAS Fuel System at the airport’s fuel farm will help improve safety of aircraft operations by reducing constrains to aircraft parking and maneuvering in the terminal area. The proposed AVGAS Fuel System will be located north of the existing terminal building, within the airport’s existing containment area. 09/18/2026 10/19/2026
27-E-0000-0042 City of Concord Proposes to construct a 10-foot wide greenway trail along Clarke Creek from the Allen Mills Neighborhood to Clarke Creek Parkway near the Highland Creek Neighborhood, with a spoke connecting to the proposed Jim Ramseur Park and Cox Mill Elementary School. The project originally terminated at Jim Ramseur Park but has been extended approximately 0.7 miles south to Clarke Creek Parkway, totaling approximately 2.3 miles of greenway trail. 09/22/2026 10/21/2026